Skip to main content
Luxury EpoxyEpoxy Flooring
Epoxy flooring specialists · Bangladesh

Luxury Epoxy Flooring Solutions

ResidentialCommercialIndustrial

Seamless, hard-wearing resin floors installed by our own trained applicators - from factory floors that take forklift traffic to metallic finishes for showrooms and homes.

Free site visit and a written quotation. No obligation.

5+Years of experience
200+Projects completed
500k+Sq. ft. installed
100%In-house applicators
Written warrantyIssued on every completed floor
In-house teamsNever subcontracted labour
Industrial-grade materialsSpecified for your conditions
Full surface preparationGrinding, repair, moisture testing
What we do

Flooring systems for every environment

Each system is specified for the conditions it has to survive - traffic, chemicals, moisture and temperature - rather than applied to every job the same way.

Not sure which system your floor needs? We will tell you on site - free visit, written quotation, no obligation.

Get Free Quotation
Why choose us

The difference is underneath the floor

Most epoxy failures are not caused by the coating. They are caused by what was skipped before it was applied.

Correct surface preparation

Diamond grinding or shot blasting, crack repair and moisture testing on every project - the groundwork that decides whether a floor lasts.

Quality materials

Industrial-grade resin systems selected for the conditions of your site rather than for the lowest possible tender price.

Programmes that are met

Phased, overnight and weekend working so that installation fits around your operation instead of interrupting it.

Support after handover

Maintenance guidance on completion, and a team that answers the phone if you need us once the job is finished.

Recent work

Projects across Bangladesh

Factories, warehouses, hospitals, showrooms, offices and private residences - installed to programme and handed over complete.

View all projects
FactoryIndustrial Epoxy Flooring installed at Garments Manufacturing Facility, Gazipur

Garments Manufacturing Facility

Gazipur45,000 sq ft

A heavy-duty floor installed across the production hall in phased sections, so that manufacturing continued uninterrupted throughout the works. Safety walkways and machine zones were line-marked as part of the installation.

HospitalSelf Leveling Epoxy Flooring installed at Private Hospital Wing, Dhaka

Private Hospital Wing

Dhaka18,000 sq ft

A seamless, joint-free floor throughout corridors, wards and treatment rooms, chosen because there are no grout lines for bacteria to collect in and the surface withstands routine disinfection.

ShowroomMetallic Epoxy Flooring installed at Automotive Showroom, Dhaka

Automotive Showroom

Dhaka8,000 sq ft

A high-gloss metallic floor developed to complement the brand's interior scheme. Samples were produced and approved on site before the final installation was carried out over a single weekend closure.

How we work

From first site visit to warranty

01

Site visit & assessment

We inspect the existing floor, test for moisture, and discuss how the space is used and what it needs to withstand.

02

Specification & quotation

You receive a written quotation with the system, build-up and scope itemised, so you can see exactly what is included.

03

Surface preparation

Mechanical grinding or shot blasting, followed by repair of cracks, joints and any spalled areas of the slab.

04

Installation

Primer, body coats and topcoat applied by our own teams, working to the agreed phasing and programme.

05

Handover & warranty

Final inspection with you, maintenance guidance, and the written warranty documentation issued.

Catalogue

Choose the finish that suits the space

17 metallic shades, 15 flake blends and the full RAL range for solid colours - with custom matching on larger projects.

See the full catalogue
Cross-section of an epoxy floor: topcoat, flake layer, base coat, primer and the prepared concrete beneath
Common questions

What clients ask us first

A correctly installed epoxy floor typically lasts 10 to 15 years, and a heavy-duty industrial system 15 to 20 years. The single biggest factor is surface preparation: a floor laid over properly ground and repaired concrete will far outlast one applied to an unprepared slab, regardless of the coating used.

Read all questions
Free site visit

Ready to discuss your flooring project?

Tell us about your space and we will arrange a free site visit and a written quotation - with no obligation.